In 2022, the implementation of Gazprom PJSC’s Electricity Generation Strategy for 2018-2027 continued, providing for introduction of new generating capacities and modernization of existing ones, as well as for decommissioning of economically non-feasible facilities, further improvement of operational efficiency, utilization of import substitution equipment, and operations diversification.
* With account to recertification.
OGK-2 is working to enhance operational efficiency in such areas as improvement of production activities, cost optimization, sales of non-core assets, reduction in the cost of supply of goods/provision of services through the use of competitive purchasing methods, and import substitution measures. The Action Plan to increase operational efficiency and optimize costs of OGK-2 is aimed at fulfilling the Company’s potential in the main type of activity and is formed in the following sections:
As part of the program for modernization of generating capacities (CCTMod), OGK-2, PJSC in 2022 continues its CCGT-324 and CCGT-170 power units construction projects at the site of OGK-2 branch i.e. Novocherkassk SDPP.
In 2022, contracts were signed for the manufacture and supply of main equipment with:
OGK-2 operations are directly related to the use of natural resources and the impact on the environment. In this regard, the Company takes all possible measures to minimize its harmful impact on the environment and allocates significant funds to implement relevant measures.
Due to investment programs for construction and modernization of capacities, replacement of coal in the Company's fuel balance by a more environmentally friendly natural gas, and due to implementation of environmental measures, there is a steady trend in reducing the total gross atmospheric emissions, as well as greenhouse gases emissions in the period from 2007 to 2022. According to the results of industrial environmental control, only over the past 6 years, emissions of pollutants into the atmospheric air have decreased by 75%, and greenhouse gas emissions have decreased by 38%.
A cycle of new investments was launched in 2019: The Company will upgrade “obsolete” capacities in the Leningrad Region (Kirishi SDPP: Turbines TG-1t, TG-2t, TG-4t) and in the Khanty-Mansi Autonomous District of Yugra (Surgut SDPP-1: Turbines 13G, 16G, 2G, 12G).
In 2022:
The OGK-2 program of effective measures includes development of design and working documents “Implementation of the project for the installation of a standby gas compressor”. The purpose of the work is to improve the reliability of gas supply to the gas turbine units of Adler TPP by installing a backup gas compressor, which ensures the possibility of fuel gas supply to the gas turbine units in cases when the main compressor is shut down controlled by APCS of Adler TPP. The design and estimate documentation is currently being developed.
In 2022, an agreement was concluded for the manufacture and supply of equipment with REP Holding JSC, which is part of the ‘Gazprom Energoholding Industrial Assets Group’.